CUMMINS N14 Specifikace Strana 298

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 587
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 297
Install the bushing in the injector rocker lever with the split
clinch joint toward the top of the lever.
The ‘‘square hole’’ must be aligned with the oil hole to
the adjusting screw. The ‘‘slot hole’’ must be aligned with
the oil hole to the injector link socket.
Use an arbor press and a rocker lever block and mandrel
set, Part No. ST-691, to push the bushing into the rocker
lever.
Rocker Lever - Magnetic Crack
Inspection (03-03)
Refer to the Alternate Repair Manual, Bulletin No.
3379035, for procedures to magnetically check for cracks
in the rocker levers.
Rocker Housing Covers - Cleaning and
Inspection for Reuse (03-04)
Cleaning
Remove the crankcase breather element, if used, and the
oil filler cap. Refer to Procedure 2-05 in the Trouble-
shooting and Repair Manual N14 Engines, Bulletin No.
3810456.
Remove the gaskets.
Steam clean the covers, and dry with compressed air.
NOTE: The valve cover gaskets are reuseable. Do not dam-
age the gasket when removing or cleaning.
Rocker Lever - Magnetic Crack Inspection (03-03) Rocker Lever Housing Assembly
N14Page 3-14
Zobrazit stránku 297
1 2 ... 293 294 295 296 297 298 299 300 301 302 303 ... 586 587

Komentáře k této Příručce

Jesus Morales 03 Apr 2025 | 23:07:31

Perfect..